Recent Northern Beaches job
Collaroy: A Renovation That Became a Full Rewire
What began as a cosmetic renovation of a five-bedroom Collaroy home turned up an asbestos switchboard and decades of non-compliant wiring once the walls came open. We stayed on the job for six months, working with two builders while the design kept changing.
- Suburb
- Collaroy NSW
- Property
- 5-bedroom home with pool
- Duration
- 6 months
- Builders
- 2, coordinated on site
- Asbestos switchboard removed and replaced with a board designed with 30% spare capacity
- Non-compliant wiring replaced to AS/NZS 3000:2018, with RCDs and surge protection
- Dedicated circuits for the pool equipment and the air conditioning
- Four downlights per bedroom, with three-way and four-way switching across the levels
- A late induction cooktop circuit threaded through finished walls without opening them
- Level 2 installation of a new private pole and consumer mains coordinated